Showing posts with label station. Show all posts
Showing posts with label station. Show all posts

Thursday, February 4, 2010

Worldwide Auction Realty Services to Auction Historic Daytona Beach Greyhound Bus Station


ORLANDO- Worldwide Auction Realty Services will auction the historic former Greyhound bus station at 150 W. International Speedway Blvd. in Daytona Beach on Thursday, Feb. 25 starting at 5:00 p.m.

The over 10,000 square foot building, constructed in 1947, was designed by architect W.S. Arrasmith in the Streamline Moderne style, a popular offshoot of the art deco style characteristic of Florida architecture from the 1930s through the 1950s.

Lori Chipps, co-managing director and lead auctioneer with Worldwide Auction Realty Services, said the building is suitable for office or retail space and the second floor which includes a spacious outdoor terrace could be modified as a residential component.

The suggested opening bid for the historic building is $295,000. The building was formerly listed for sale at $950,000.

Chipps said the building is currently listed on the National Register of Historic Places and the buyer may qualify for the 20 percent rehabilitation tax credit program for building renovations.
For more information about the auction or to register to bid, telephone 800-327-1048 or visit http://www.wwauctionservices.com/.
* * *

For more information contact:

Lori or Jon Chipps, Managing Directors Worldwide Auction Realty Services 800-327-1048

Tuesday, December 8, 2009

Cotter-Ryan tops off Premier Surgery Center building in Tavares, nears completion of Tavares Station

TAVARES, Fla. --- Cotter-Ryan Commercial, LLC of Longwood has topped off the 20,000 square foot Premier Surgery Center building under construction on Vindale Rd. off U.S. 441 in Tavares.

The 20,000 square foot building will include an 11,000 square foot surgery center and 9,000 square feet of medical office space when it opens next year, according to Scott Ryan, president of Cotter-Ryan Commercial.

Ryan said the general contracting firm will complete the 8,000 square foot, two story Tavares Station restaurant facility on Main Street in downtown Tavares next spring.

Parcel C, LLC is developing the facility which will be home to a second floor deli and café overlooking Lake Dora and a ground floor restaurant.

Construction cost is estimated at over $4 million.

For more information, contact:
Scott H. Ryan, President, Cotter Ryan Commercial, LLC, 407-786-7686 sryan@cotterryan.com
Larry Vershel or Beth Payan, Larry Vershel Communications 407-644-4142, lvershelco@aol.com